Digital twin assisted workpiece referencing for compensating the stock deviation of casted parts

Sorry you have no rights to view this entry!

2 Comments

  1. There are valuable insights in the study! I wonder if the updated coordinates will be manually entered into the CNC machine or will this system be a real time closed loop optimization system.

    • Thank you for your feedback! Based on the updated coordinates, the CNC code is generated and it must be copied manually to the CNC machine. However, it is done only when a new LOT of casted parts arrives, so practically every two-three months.

Leave a Reply

Your email address will not be published. Required fields are marked *