{"id":2149,"date":"2021-07-14T09:30:00","date_gmt":"2021-07-14T07:30:00","guid":{"rendered":"http:\/\/cirpicme.org\/?page_id=2149"},"modified":"2021-07-13T18:57:02","modified_gmt":"2021-07-13T16:57:02","slug":"production-planning-and-process-optimization-of-a-cell-finishing-process-in-battery-cell-manufacturing","status":"publish","type":"page","link":"https:\/\/cirpicme.org\/index.php\/assembly-battery-production\/production-planning-and-process-optimization-of-a-cell-finishing-process-in-battery-cell-manufacturing\/","title":{"rendered":"Production planning and process optimization of a cell finishing process in battery cell manufacturing"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>by <em>Johannes Wanner, Max Weeber,Kai Peter Birke, Alexander Sauer<\/em><\/em> <em>(Germany)<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Abstract<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the layout of battery cell manufacturing, the formation process is a cost and area intensive process step. Different process parameters significantly influence the machine utilization, the energy flow, and the output of the cell manufacturing. This usually leads to non-optimally sized and operated formation lines. Therefore, a basic and optimal layout, as well as an optimized production flow, is presented here. The process optimizations of the cell finishing process are carried out using discrete event simulation. In addition to the process parameters, the process costs, the process energy, as well as regulatory framework conditions are also considered. This approach promotes transparency and reliability in the planning and operation of future formation processes in battery cell manufacturing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Keywords<\/strong>: Battery cell manufacturing, Formation; process layout, Process optimization<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Video presentation<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-video\"><video height=\"1080\" style=\"aspect-ratio: 1920 \/ 1080;\" width=\"1920\" controls src=\"http:\/\/cirpicme.org\/wp-content\/uploads\/2021\/07\/Wanner_Johannes2.mp4\"><\/video><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Presenting author<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-subtle-light-gray-background-color has-background\"><tbody><tr><td><\/td><td><\/td><td><\/td><\/tr><tr><td><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"188\" class=\"wp-image-2202\" style=\"width: 150px;\" src=\"https:\/\/i0.wp.com\/cirpicme.org\/wp-content\/uploads\/2021\/07\/Johannes_Wanner-2.jpg?resize=150%2C188\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/cirpicme.org\/wp-content\/uploads\/2021\/07\/Johannes_Wanner-2.jpg?w=640&amp;ssl=1 640w, https:\/\/i0.wp.com\/cirpicme.org\/wp-content\/uploads\/2021\/07\/Johannes_Wanner-2.jpg?resize=240%2C300&amp;ssl=1 240w, https:\/\/i0.wp.com\/cirpicme.org\/wp-content\/uploads\/2021\/07\/Johannes_Wanner-2.jpg?resize=120%2C150&amp;ssl=1 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/td><td><strong>Name:<\/strong><br><br><strong>Affiliation:<\/strong><br><br><strong>Email:<\/strong><\/td><td>Johannes Wanner<br><br>Fraunhofer Institute for Manufacturing Engineering and Automation IPA, Germany<br><br>johannes.wanner@ipa.fraunhofer.de<\/td><\/tr><tr><td><\/td><td><\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>by Johannes Wanner, Max Weeber,Kai Peter Birke, Alexander Sauer (Germany) Abstract In the layout of battery cell manufacturing, the formation process is a cost and area intensive process step. Different process parameters significantly influence the machine utilization, the energy flow, and the output of the cell manufacturing. This usually leads&#8230;<\/p>\n<p> <a class=\"continue-reading-link\" href=\"https:\/\/cirpicme.org\/index.php\/assembly-battery-production\/production-planning-and-process-optimization-of-a-cell-finishing-process-in-battery-cell-manufacturing\/\"><span>Continue reading<\/span><i class=\"crycon-right-dir\"><\/i><\/a> <\/p>\n","protected":false},"author":9,"featured_media":0,"parent":2406,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-2149","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/pages\/2149","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/comments?post=2149"}],"version-history":[{"count":3,"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/pages\/2149\/revisions"}],"predecessor-version":[{"id":2211,"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/pages\/2149\/revisions\/2211"}],"up":[{"embeddable":true,"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/pages\/2406"}],"wp:attachment":[{"href":"https:\/\/cirpicme.org\/index.php\/wp-json\/wp\/v2\/media?parent=2149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}