Dear Ms. Varela,
thank you for your very interesting presentation dealing with the development and application of a meta-model based on simulation to identify the best flow shop configuration in a given industrial scenario.
My question is: the four flow shop configurations, considered in the work, have been identified with reference to a specific industrial scenario? Or the specific industrial scenario is not actually relevant for the scheduling problem solving capability of the proposed meta-model?
Thank you!
Dear Ms. Varela,
thank you for your very interesting presentation dealing with the development and application of a meta-model based on simulation to identify the best flow shop configuration in a given industrial scenario.
My question is: the four flow shop configurations, considered in the work, have been identified with reference to a specific industrial scenario? Or the specific industrial scenario is not actually relevant for the scheduling problem solving capability of the proposed meta-model?
Thank you!